Overseas
Indonesia DWTP Treatment
时间:2022-03-30 19:12:22
The raw water with high turbidity need to be treated as processing water. Total capacity is 150000m3 /d.
HANQI take the classic process package of HELP-M and V-filter to achieve the standard.